PENG CHENG
NEWS LIST
Check category
Shenzhen Pengcheng Construction Group Co., Ltd.
Address: Building A, Xinzhuyuan, Nonglin Road, Futian District, Shenzhen
Phone:0755-82932228
FAX:0755-82932098
Email:518040
Website: www.pcjzgroup.com
From next year, high-rise buildings in some areas of Chongqing will be forced to phase out on-site pouring stairs
From next year, high-rise buildings in some areas of Chongqing will be forced to phase out on-site pouring stairs
2015-11-04 00:00
A few days ago, the Municipal Urban and Rural Construction Commission issued the "Notice on Prohibiting and Restricting the Use of Outdated Technologies in the Construction Field of Chongqing (No. 8)" (publication draft). The circular stated that, in order to promote the modernization of the construction industry, starting from January next year, the on-site pouring stairs shall not be used for the construction of some high-rise buildings in our city.
According to a person from the Urban and Rural Construction Committee of the City, in the past, whether it was a small building with several floors or a high-rise building with dozens of floors, the main method of cast-in-place stairs was used. This method not only takes a long time for construction, but also because of the uneven level of construction workers, the quality is also difficult to guarantee. The Municipal Urban and Rural Construction Committee has decided to start high-rise residential buildings with reinforced concrete shear wall structures (including commercial bottoms) in the main urban areas, Fuling, Yongchuan, Nanchuan, Qijiang, Fengdu and other places with a construction area of 80,000 square meters and above. It is forbidden to use on-site pouring stairs, and to promote prefabricated concrete stairs.
The biggest difference between cast-in-place stairs and prefabricated stairs is that the prefabricated stairs are designed and produced according to strict dimensions, which is easier to control the quality and installation, and can also make the stairwells of residential buildings more spacious and safe. "It is not only the prefabricated stairs, but also the construction industrialization technology. In the future, the interior load-bearing wall materials of the high-rise buildings in the main city may be thinner and more reliable, and the space will be saved at once." The city urban and rural construction committee said.
In addition to the on-site pouring of stairs, hand-produced residential kitchens and bathroom exhaust gas ducts, and residential kitchens and bathroom exhaust gas ducts made of magnesite materials are prohibited from being used for construction in the city due to unstable quality and poor durability. engineering.
- Affiliates
- Design
- Fapeng Decoration
- Mechanical installation
- Eastern Project
- Prefabricated parts
- More
- Culture
- Concept
- Staff style
- Talent Persom
- Concept
- Recruitment
- Contact
- Shenzhen Pengcheng Construction Group Co., Ltd.
- Address: Building A, Xinzhuyuan, Nonglin Road, Futian District, Shenzhen
- TEL:0755-36986888
- FAX:0755-36991999
- Email:518040
- URL:www.pcjzgroup.com

Copyright (2015-2018) Shenzhen Pengcheng Construction Group Co., Ltd.《中华人民共和国电信与信息服务业务经营许可证》
粤ICP备05140404号
POWER BY 300.cn